Energy Gateway West (GWW)
- New 500 kV transmission lines between Wyoming and Idaho, and two new single-circuit 230 kV transmission lines in Wyoming
- Capacity: Up to 3,000 MW to Wyoming and Idaho
- Length: Part of approximately 2,000 miles of new high voltage transmission lines PacifiCorp plans to build to address long-term native-load and third party needs in its six-state service territory (WY, UT, ID, OR, WA, CA)
- Estimated in-service Date: 2014-2016
- Cost: Part of >$6.1 billion total Energy Gateway estimated project cost
- Developers: PacifiCorp and Idaho Power
- WECC Path Rating Process: Phase II
- ROW & Permitting Status: Formal application was filed with the BLM in 2007
- Status:
- Feasibility studies/Power Flow analyses continuing
- Project has been entered into the WECC, NTTG regional planning group
- Third party contractor to BLM has been hired
- Study group meetings started May 2009
- Business Model: Utilities rate-base, end market(s): to address PacifiCorp’s and Idaho Power’s native-load and third party needs
- For more information, please call (801) 220-4221, or e-mail ConstructionProjects@pacificorp.com
- Link: http://www.pacificorp.com/Article/Article79554.html